Dalewood Bridge Replacement - St. Thomas, ON

Owner: City of St. Thomas
Consultant: Entuitive
Contractor: McLean Taylor Construction Ltd. 
Scope: Fabrication, Delivery, Erection and Coatings


• 2 girder lines totalling 50.6m in length
• 4 fabricated box girders, 1 pile cap floor beam assembly, 16 intermediate floor beams, 14 cantilevered floor beams, 2 pylons and 12 stay braces
• 3-part paint system on girder ends and all above deck steel
• Erection completed in one mobilization


Blackfriars Bridge - London, ON

Owner: City of London
Consultant: Dillon Consulting Ltd.
Contractor: McLean Taylor Construction Ltd.
Scope: Fabrication and Delivery

• ​Fabrication of new components and rehabilitation of existing features for the 140 year-old 68m single span, single lane road bridge
• ​Fabricated new chords, floor beams, stringers, diagonal bracing, and portals
•​ Rehabilitation of phoenix, struts and portal lattice


MTO 2018-4008 County Road 2/34 Underpass
MTO 2018-4008 Hwy 401 Eastbound and Westbound Lanes at Raisin River
- Lancaster, ON

Owner: Ministry of Transportation Ontario
Consultant: Dillon Consulting Ltd. 
Contractor: R.W. Tomlinson Ltd.
 

Underpass

Scope: Fabrication, Delivery, Erection and Coatings

• 3 girder lines totalling 90m in length 
• 9 tub girders, skewed geometry
• 3-part paint system on girder ends
• Erection completed in one nighttime, weekend mobilization

East and West Lanes

Scope: Fabrication, Delivery, Erection and Coatings

• EBL - 5 girder lines totalling 67.5m in length 
• WBL - 5 girder lines totalling 67.5m in length
• 33 girders, haunched at piers
• 3-part paint system on girder ends and exterior field splices
• Construction staged over 2 seasons